Re: Road Condtions - N12/N4

Post by Richprins »

When are you coming down, Pumbaa? 0()


Please check Needs Attention pre-booking: https://africawild-forum.com/viewtopic.php?f=322&t=596
User avatar
Flutterby
Posts: 43849
Joined: Sat May 19, 2012 12:28 pm
Country: South Africa
Location: Gauteng, South Africa
Contact:

Re: Road Condtions - N12/N4

Post by Flutterby »

We used it last week and there were 2 stop and gos. One opened as soon as we arrived and the other took about 10 minutes. ;-)

We took the Waterval Boven road on the way back and there were quite a few trucks, so I think either way you're going to be held up a little. -O-


User avatar
Pumbaa
Posts: 8028
Joined: Wed Jun 06, 2012 8:53 pm
Contact:

Re: Road Condtions - N12/N4

Post by Pumbaa »

Thanks so far - Will be travelling from O.R. Tambo to Malelane on Thursday….

Will decide when we are there - I guess as Flutterby said it will after all be the same from the travelling time \O


PuMbAa

Please visit our website: www.photomaniacs.de
User avatar
Richprins
Committee Member
Posts: 75412
Joined: Sat May 19, 2012 3:52 pm
Location: NELSPRUIT
Contact:

Re: Road Condtions - N12/N4

Post by Richprins »

Here is the number for TRAC Information, the managing agents of the N4: 0800872264

They are very good and will assist with info or problems! \O

Stp/gos are still there on Schoemanskloof... :no:


Please check Needs Attention pre-booking: https://africawild-forum.com/viewtopic.php?f=322&t=596
User avatar
Dzombo
Posts: 2387
Joined: Fri Jun 01, 2012 1:18 pm
Location: UK
Contact:

Re: Road Condtions - N12/N4

Post by Dzombo »

Had a thought since I will be travelling this way in the next month or so.....

If the nearest town to a toll plaza doesn't have electricity due to load shedding. Does the toll have it's own power supply?
Or are the booms left open?


User avatar
Richprins
Committee Member
Posts: 75412
Joined: Sat May 19, 2012 3:52 pm
Location: NELSPRUIT
Contact:

Re: Road Condtions - N12/N4

Post by Richprins »

They have extensive long-duration backup generator power, Dzombs! :twisted: :twisted: :twisted:


Please check Needs Attention pre-booking: https://africawild-forum.com/viewtopic.php?f=322&t=596
User avatar
Dzombo
Posts: 2387
Joined: Fri Jun 01, 2012 1:18 pm
Location: UK
Contact:

Re: Road Condtions - N12/N4

Post by Dzombo »

Richprins wrote: Wed Feb 13, 2019 12:02 pm They have extensive long-duration backup generator power, Dzombs!
I guess that's better than say switching over to a manual system, with the process taking 10x longer --00--


User avatar
Richprins
Committee Member
Posts: 75412
Joined: Sat May 19, 2012 3:52 pm
Location: NELSPRUIT
Contact:

Re: Road Condtions - N12/N4

Post by Richprins »

N4 roadworks to resume this month
In a press release issued by TRAC it is confirmed that a major upgrade and rehabilitation of the N4 Toll Route between Belfast and Machadodorp will resume this month.
4 hours ago

Image

The project was suspended last year due to community unrest. However, months of negotiations between the eMakhazeni Local Municipality, TRAC, SANRAL and WBHO/Motheo JV (contractor) has resulted in the signing of a memorandum of understanding (MOU) and a nod for resuming the project.

The MOU focuses on various issues, with emphasis on principles and guidelines that ensure that local communities benefit from the initiative.

The R400-million project will see section 5B rehabilitated and upgraded to a four-lane carriageway. Blasting is will start in April 2019 and the roadworks are expected to take 36 months to complete.



The major upgrade of the N4 between Matola and Maputo (Sections 19 and 20) in Mozambique is ongoing and Mozambican road users will soon have a six-lane carriageway to enjoy between these two cities.

This extensive project includes comprehensive roadworks between the Shoprite Centre Intersection in Matola and the June 16, Circle in Maputo.

The project has fallen behind schedule due to circumstances beyond TRAC’s control, but they are committed to completing it by July 2019.

There were various reasons for the delays, including issues at two CFM structures and the relocation of dwellings that were on the road reserve, but these have been addressed.

Although closures relating to the roadworks will be in place until June 2019, streetlights are being installed and will be operational this month.
0137523772


TRAC is looking forward to the completion of the project and is confident that once concluded road users will appreciate the safer and easier drive.
The following construction and rehabilitation projects are underway or due to commence:

Bronkhorstspruit:

The rehabilitation of the existing carriageway is underway, and the project will be complete in April this year. Daytime shoulder closures and occasional lane reductions can be expected until completion.

Schoemanskloof (between Crossroads and Bambi):

The rehabilitation of the existing carriageway is underway, and the project is advancing well. Completion is expected in May this year. There is currently one Stop/Go in place, which will be lifted during long weekends.

Montrose to Schagen:

This project will commence in the next three months and will see the rehabilitation (milling and overlaying) of the existing pavement. The nature of the roadworks will result in long-term lane closures as well as a daytime Stop/Go at the Montrose Interchange during off-peak hours.

Karino Interchange:

This much-anticipated project has been initiated with community participation starting this month.

TRAC also mentioned that they would like to thank the public for their patience and understanding at construction zones and assures the public of their continued commitment to maintaining the N4 Toll Route on par with world standards.

https://lowvelder.co.za/471580/n4-roadw ... ume-month/


Please check Needs Attention pre-booking: https://africawild-forum.com/viewtopic.php?f=322&t=596
User avatar
Peter Betts
Posts: 3080
Joined: Fri Jun 01, 2012 9:28 am
Country: RSA
Contact:

Re: Road Condtions - N12/N4

Post by Peter Betts »

Too far South ..hardly ever do that road ..Polokwane turn right ..Magoebaskloof and in ..Thats me


User avatar
Dzombo
Posts: 2387
Joined: Fri Jun 01, 2012 1:18 pm
Location: UK
Contact:

Re: Road Condtions - N12/N4

Post by Dzombo »

Richprins wrote: Mon Mar 11, 2019 5:42 pm N4 roadworks to resume this month
In a press release issued by TRAC it is confirmed that a major upgrade and rehabilitation of the N4 Toll Route between Belfast and Machadodorp will resume this month.
Is this likely to be in place in 2 weeks ?
How would I find out closer to the time ?