Berg-en-Dal Rest Camp
- Lisbeth
- Site Admin
- Posts: 67592
- Joined: Sat May 19, 2012 12:31 pm
- Country: Switzerland
- Location: Lugano
- Contact:
Re: Berg-en-Dal Rest Camp
I always seem to forget the whole scenery that has to be performed to get "things" fixed in the "right" way
"Education is the most powerful weapon which you can use to change the world." Nelson Mandela
The desire for equality must never exceed the demands of knowledge
The desire for equality must never exceed the demands of knowledge
- Richprins
- Committee Member
- Posts: 76116
- Joined: Sat May 19, 2012 3:52 pm
- Location: NELSPRUIT
- Contact:
Re: Berg-en-Dal Rest Camp
09.05.24
Social Madia Alert
Please note that some facilities in Berg en dal are without power. The ESKOM transformers fuse has malfunctioned once more following the departure of ESKOM personnel who had come to fix it after it failed this afternoon.
Without the mini-substation, the generator is unable to support the entire camp. Consequently, both the camping site and staff residences will experience a power outage this evening. Units 70 through 82 will also be impacted. The rest of the units are not affected by the outage.
Assistance will be sought starting tomorrow morning once again. Please be patient with us as this is an issue only Eskom can rectify.
Social Madia Alert
Please note that some facilities in Berg en dal are without power. The ESKOM transformers fuse has malfunctioned once more following the departure of ESKOM personnel who had come to fix it after it failed this afternoon.
Without the mini-substation, the generator is unable to support the entire camp. Consequently, both the camping site and staff residences will experience a power outage this evening. Units 70 through 82 will also be impacted. The rest of the units are not affected by the outage.
Assistance will be sought starting tomorrow morning once again. Please be patient with us as this is an issue only Eskom can rectify.
Please check Needs Attention pre-booking: https://africawild-forum.com/viewtopic.php?f=322&t=596
- Lisbeth
- Site Admin
- Posts: 67592
- Joined: Sat May 19, 2012 12:31 pm
- Country: Switzerland
- Location: Lugano
- Contact:
Re: Berg-en-Dal Rest Camp
Not exactly good publicity for whoever was supposed to fix it
"Education is the most powerful weapon which you can use to change the world." Nelson Mandela
The desire for equality must never exceed the demands of knowledge
The desire for equality must never exceed the demands of knowledge
- Richprins
- Committee Member
- Posts: 76116
- Joined: Sat May 19, 2012 3:52 pm
- Location: NELSPRUIT
- Contact:
Re: Berg-en-Dal Rest Camp
11.05.24
Update on Berg-en-Dal Electrical Repair
Kruger National Park Management is pleased to inform our valued guests that our service provider team from MET successfully identified and addressed the electrical malfunction. The issue was located along the power line servicing the camping area and units 70 to 92. Our efforts required excavation to access the affected cable, which was accomplished with the help of our dedicated local workforce.
To rectify the problem, we installed two new joints, effectively eliminating the damaged sections of the cable. As a result, electrical service has been momentarily restored via our generator just a short while ago. However, we are currently awaiting ESKOM's intervention to replace the fuses that failed last night.
We thank you all for your patience while we deal with this issue.
Word of appreciation to the support services, esp. Jimmy and Linda!
Update on Berg-en-Dal Electrical Repair
Kruger National Park Management is pleased to inform our valued guests that our service provider team from MET successfully identified and addressed the electrical malfunction. The issue was located along the power line servicing the camping area and units 70 to 92. Our efforts required excavation to access the affected cable, which was accomplished with the help of our dedicated local workforce.
To rectify the problem, we installed two new joints, effectively eliminating the damaged sections of the cable. As a result, electrical service has been momentarily restored via our generator just a short while ago. However, we are currently awaiting ESKOM's intervention to replace the fuses that failed last night.
We thank you all for your patience while we deal with this issue.
Word of appreciation to the support services, esp. Jimmy and Linda!
Please check Needs Attention pre-booking: https://africawild-forum.com/viewtopic.php?f=322&t=596